They re-roofed the house and installed 8.4 kW in the same week. When the city inspector showed up, everything passed on the first visit.
The apex of opportunity
Custom solar for Southern California homes — designed around your usage and today's NEM 3.0 rates, installed by a crew that also builds the roof beneath it.
Solar — our flagship
Under NEM 3.0, cookie-cutter solar doesn't pay anymore — design does. Every VertX system is engineered around your actual usage, your rate plan, and your roof.
And the roof beneath it
Solar is a 25-year commitment — your roof has to keep up. VertX holds the roofing license too: tear-offs, re-roofs, and repairs in asphalt, tile, and metal, every one built solar-ready. If your roof isn't ready for panels, we'll tell you before we sell you any.
More about our roofing →
Everything we do
Solar leads, and the rest of the house follows — every service below feeds the same goal: a home that makes its own power and wastes none of it.
Custom solar systems designed for NEM 3.0 economics.
→Re-roofs and repairs, built solar-ready from day one.
→Backup for outages, savings on time-of-use rates.
→High-efficiency comfort, sized honestly.
→Energy-rated replacements that seal the envelope.
→Recent work
Every project above was permitted, built, and inspected under one VertX license — no subcontractors.
Why homeowners pick VertX
Here's what most solar companies won't tell you: they subcontract the roof work. And when a leak shows up under the array, the solar company blames the roofer, the roofer blames the panels, and you hold the bill. VertX holds both licenses — so exactly one company is responsible for everything above your ceiling.
Panel mounts installed by the people who warranty the roof they penetrate. Nothing gets voided, because nobody else touched it.
Roof and solar drawn, submitted, and inspected together. Fewer visits from the city, weeks off your timeline.
Roof first, array second, always. No tearing panels off a three-year-old system because the shingles under them failed.
The process
Roof condition, shade study, and a real look at your usage — free, on-site, no pressure script.
One engineered plan for roof and array. We pull the permits and handle the utility paperwork.
Roof first, then racking, panels, and storage — our crews, not subcontractors.
Inspection, permission to operate, and monitoring on your phone. We stay on the hook for 25 years.
Homeowner reviews
They re-roofed the house and installed 8.4 kW in the same week. When the city inspector showed up, everything passed on the first visit.
Three other companies quoted solar without ever getting on the roof. VertX climbed up, told us the tile needed work first, and priced both together. That honesty won us over.
Power stayed on through the August outage while the whole street went dark. The battery paid for itself in peace of mind alone.